Order tracking thread. Post your order #s here for updates.

Status
Not open for further replies.
For those of you that have ordered, if you know your order#, just reply to this thread and I can check the status for you.

You will see me use the term TPW. This stands for Target Production Week. It means that the truck is scheduled to be built at some point during that week.

Below are the relevant GM order status codes.

  • 0500 Order Configuration Accepted
  • 1100 ORDER PLACED AT DEALERSHIP / PRELIMINARY ORDER ACCEPTED
  • 2000 ORDER ACCEPTED BY GM
  • 2030 ORDER EDITED BY GM
  • 2500 ORDER PREFERENCED, SENT TO PRODUCTION
  • 3000 ORDER ACCEPTED BY PRODUCTION CONTROL
  • 3100 ORDER AVAILABLE TO SEQUENCE
  • 3300 ORDER SELECTED, SCHEDULED FOR PRODUCITON
  • 3400 ORDER BROADCAST FOR PRODUCTION (LOADED ON ASSEMBLY PLANT COMPUTERS)
  • 3800 ORDER PRODUCED, VIN IS AVAILABLE
  • 4000 VEHICLE AVAILABLE TO SHIP
  • 4150 VEHICLE INVOICED
  • 4B00 ORDER BAYED; VEHICLE IS WAITING ON TRANSPORTATION OR PULLED FOR QUALITY CONTROL
  • 4D00 VEHICLE BUILT BUT ON HOLD, MISSING PARTS
  • 4200 ORDER SHIPPED
  • 4300 INTERMEDIATE DELIVERY, VEHICLE HAS BEEN MOVED TO ANOTHER LOCATION FOR SHIPMENT
  • 4800 RAIL RAMP UNLOAD; VEHICLE AT RAIL ROAD DESTINATION AWAITING TRUCK TRANSPORT TO DEALER
  • 5000 VEHICLE DELIVERED TO DEALER
  • 6000 VEHICLE DELIVERED TO CUSTOMER
BZVGZ7 please and thanks!
 
4800, 11/11 eta
Thank you! I’ve read through almost this whole thread so realize ETA are not always accurate. But will the ETA date in the system get pushed back if the first one is missed? Dealer told me 10/30 originally.
 
BJCXMT
Can you tell me when this one was built? Or delivered to dealer?
 
BMWZ93 please
Thank you!

For those browsing the site for timelines here is info from dealer and GearheadSS on my GMC AT4. (Info from dealer sketchy and inconsistent but I will include that which seems consistent.)
1/3/22 - "reserved" with $100, 3/26/22 - ordered,
6/14/22 - order accepted,
7/12/22 - built/invoiced/VIN
8/23/22 - ETA 8/31/22
8/24/22 - dealer tracked VIN to Jack Cooper Transport distribution center in Roanoke Indiana
9/12/22 - ETA 8/31/22
9/30/22 - ETA 8/31/22
10/11/22 - sitting at Jack Cooper sidelot in Fort Wayne Indiana without any holds waiting for GM to say to ship (called dispatcher)
11/8/22 - ETA 1/13/23

To make things worse the interest rate keeps climbing to potentially make this truck unaffordable.
 
Status
Not open for further replies.

Most Member Reactions

Back
Top