Order tracking thread. Post your order #s here for updates.

Status
Not open for further replies.
For those of you that have ordered, if you know your order#, just reply to this thread and I can check the status for you.

You will see me use the term TPW. This stands for Target Production Week. It means that the truck is scheduled to be built at some point during that week.

Below are the relevant GM order status codes.

  • 1100 ORDER PLACED AT DEALERSHIP / PRELIMINARY ORDER ACCEPTED
  • 2000 ORDER ACCEPTED BY GM
  • 2030 ORDER EDITED BY GM
  • 2500 ORDER PREFERENCED, SENT TO PRODUCTION
  • 3000 ORDER ACCEPTED BY PRODUCTION CONTROL
  • 3100 ORDER AVAILABLE TO SEQUENCE
  • 3300 ORDER SELECTED, SCHEDULED FOR PRODUCITON
  • 3400 ORDER BROADCAST FOR PRODUCTION (LOADED ON ASSEMBLY PLANT COMPUTERS)
  • 3800 ORDER PRODUCED, VIN IS AVAILABLE
  • 4000 VEHICLE AVAILABLE TO SHIP
  • 4150 VEHICLE INVOICED
  • 4B00 ORDER BAYED; VEHICLE IS WAITING ON TRANSPORTATION OR PULLED FOR QUALITY CONTROL
  • 4200 ORDER SHIPPED
  • 4300 INTERMEDIATE DELIVERY, VEHICLE HAS BEEN MOVED TO ANOTHER LOCATION FOR SHIPMENT
  • 4800 RAIL RAMP UNLOAD; VEHICLE AT RAIL ROAD DESTINATION AWAITING TRUCK TRANSPORT TO DEALER
  • 5000 VEHICLE DELIVERED TO DEALER
  • 6000 VEHICLE DELIVERED TO CUSTOMER
BFKRDT
 
I am updating the ZR2 Factory Order Tracking sheet as GearheadSS provides status updates. The more complete everybody's information is, the better visibility we should have to determine approx. how long it takes to move from each step.

If you see a field on the row with your name that is missing dates or information you can provide, please share that info and I will update it.
Status:
3000 4/26
3100 4/29
3300 4/29
3400 5/3
3800 5/25

TPW 5/16
 
My dealer said any orders not accepted by GM by 6/2/22 will become 2023 models, and those 23 models don’t start building until late august. Any accuracy to that?
No, that's not correct. The final dealer allocation week for 2022 model is 6/30/22. The final consensus for 2022 is the 2nd June consensus which will likely happen on 6/23/22.

Consensus is when dealers see how many allocations they are getting over the next 2-3 weeks for each model and where they have to accept those allocations. If they do not accept the allocations on the consensus, they will lose them.

The first 2023 allocation week is 7/21/22. The unallocated 2022 orders will have to be resubmitted by the dealer as a 2023. They don't automatically move over to 2023.
 